This paper is based on the requirement of social and economical development of Baoding city, made the 2006 to be standard year, 2007-2010 to be objective year, according to the interrelated documents, directed to the , and so on, it analyzed and elaborated to the present situation and question of Baoding distribution network, combined theory and experience which I had been learned, made the development question of 10KV and under distribution network to be a important research. In the research course, I adopted Moving Average method, linear regression method, Index Smoothness method etc. to get the Load Forecasting, analyzed the forecasting results, brought up the electric network development goal and plan in few years coming , and corresponding measures. |