Font Size: a A A

On The Cost Management Of Early Stage Of Construction Project

Posted on:2009-06-29Degree:MasterType:Thesis
Country:ChinaCandidate:T HuFull Text:PDF
GTID:2189360245475702Subject:Project management
Abstract/Summary:PDF Full Text Request
Though the project cost control and management is a process of control, the preparation and management on the early stage of the project has critical impact on the whole project cost control. Therefore the construction cost control is focused on the early stage of project. However, the weak pre construction projects feasibility study, low quality control at the early stage such as non standardize biding, loose contract etc have serious negative impact on the cost management of the construction project. In that case, to strengthen the cost management in the early stage of the construction is very important to control the whole project cost. Suggested measurements are as follows: the feasibility study and evaluation are critical in the decision making process. The bidding for design, technology, and construction at the design stage is better to be organized separately. Encouraging limited budget design, standard design, design supervision etc, effective integration of technology and economics, list pricing and the construction contract on the principle of fair and reasonable. In short, the pre-construction project cost control for the entire project cost control has played a very important role.
Keywords/Search Tags:costs management, the feasibility study, limited budget design, design supervision
PDF Full Text Request
Related items