Font Size: a A A

Research On Schedule Control To Carbon Dioxide Recycling Project

Posted on:2009-12-01Degree:MasterType:Thesis
Country:ChinaCandidate:J LiuFull Text:PDF
GTID:2189360248452138Subject:Project management
Abstract/Summary:PDF Full Text Request
Carbon dioxide is emitted into the atmosphere, not only damaging the environment, but also wasting precious resources of carbon. The carbon dioxide resource of China is very rich. However, as the recovery of carbon dioxide adverse measures in each of the recycling and reuse emissions of carbon dioxide less than the 1%. Not only caused atmospheric pollution, Formation the terrible greenhouse effect, but also wasting valuable resources.Completion of this project full use of carbon dioxide recovery unit Liaohe Oilfield Petrochemical Plant hydrogen decarbonization of the exhaust gas recovery plant emissions of carbon dioxide, refining and purification. Not only reduce pollution and increase economic benefits, but also can be solved oilfield gas injection production needs. The use of carbon dioxide to recall, on the one hand so that oil and coal products by secondary energy use, on the other hand, the use of heavy oil exploitation in the oil and gas resources with new alternatives. Currently, Liaohe Petroleum Exploration Bureau has carbon dioxide recycling project as a special organization and implementation of major scientific and technological, and has entered the stage of industrialization.This theses use the theory of modern project management, Liaohe Oilfield Petrochemical Plant to carbon dioxide recycling project as the research object, system from the project background, market analysis, technical analysis, economic analysis, and other aspects of the project carried out feasibility study and appraisal. The progress of Liaohe Oilfield Petrochemical Plant carbon dioxide recovery project implementation process use the establishment of the organizational structure, the working structure of the decomposition, network mapping, control theory and so on. Using a variety of methods and measures to control the programs to ensure that the project carried out by the master plan and project operation can be realized on schedule.
Keywords/Search Tags:Carbon Dioxide Recycling, Feasibility Study, Schedule Control
PDF Full Text Request
Related items