Font Size: a A A

A Study On Project Implementation Quality Control Of Backbone Ring Cable Connection In DanDong

Posted on:2010-02-11Degree:MasterType:Thesis
Country:ChinaCandidate:M S HuangFull Text:PDF
GTID:2189360272997667Subject:Project management
Abstract/Summary:PDF Full Text Request
Review the 20th century,The humanity has achieved the great achievement in the nature field of activity,The productive forces develops highly,The product and the grade of service enhances unceasingly;Since the 21st century,The quality becomes all active the subject,Therefore,The project and the service quality question is initiating the challenge to us.As a result of new technical unceasing emergence,The customer to the project quality will propose that will be more, the renewal, a stricter request.Especially in buyers' market situation,The customer will be more nitpicking to the project and the grade of service.Communication engineering's quality guarantees the communication network unimpeded key.The communication engineering quality is in the national present relevant law, the laws and regulations, the technical standard, the design document and the project contract to the project security, the use, the economy, artistic and so on characteristic synthesis requests.Looked from the function and the use value,The communication engineering quality manifests in aspects and so on serviceable, reliable, efficient, appearance quality and environment coordinated.The influence communication engineering quality's factor are many,But induces mainly has the following five aspects,Namely human, material, machinery, method and environment,This is also the communication engineering quality control key point.The human is the operator who and the superintendent refers to participates in the design construction directly,Including design construction operators and administrative personnels,As well as oversees engineer.The work quality is decided by the operation and management all department's each people.Therefore each operating post and each person's work directly or is affecting the project quality indirectly.Improves the work quality the key to lie in controls person's quality and the work level.Human's quality includes:Technical level, cultural education, psychological behavior, quality consciousness and physical requirements and so on. The material is refers to raw material which, the component and the project metal structure and the equipment the engineering project uses and so on.The material is the project physical conditions,These materials have not been unable to construct,The material quality is unqualified,Project quality impossible meet standards.Reinforcement quality control,Is the project quality control important content.The machinery refers to the instrumentation equipment which the construction machinery equipment and the examination project quality uses. The construction machinery equipment realizes the mechanized construction important material base, is in the modern construction the essential facility, has the immediate influence to the construction quality. Therefore when carries on the construction machinery equipment shaping and the performance parameter determination, should consider it to guaranteed the construction quality the influence, and considered uses it in the economical rationality, the technical sophistication and the use operates and maintains on convenient. The quality examination center uses the instrumentation equipment, appraises the construction quality essential basic requirement, it also has the direct influence to the quality control.The method or the craft are refer to the job practice, the construction craft and the plan of construction. Plan of construction's rationality, the job practice or the craft sophistication is enormous to the construction quality influence. In construction practice, because the plan of construction considered that the week, construction craft backwardness does not cause the construction progress to be slow, the drop in quality, the investment increase the situation sometimes occurs. Therefore, when works out and the verification plan of construction and the construction craft, must link to the project reality, from aspects and so on technology, organization, management, economy carries on the overall analysis, the overall evaluation, guarantees in the plan of construction technology feasible, in economy reasonable, and is advantageous in improving the project quality. The environmental factor are many, mainly refers to the influence project quality the technical environment, the natural environment and construction management environment and so on. The technical environment the regulations which, the standard, the design paper and uses including the construction factors and so on quality rating standard. Natural environment including factors and so on geology, hydrology, meteorology. Construction management environment including factors and so on performance test, monitoring system, quality visa system.Project quality's quality, is mainly decided by Construction's construction level and the management level, because the Construction is the quality person directly responsible, follows the following several principles in the communication engineering quality control process:①Insisting the quality first principle.②Insisting by the artificial core principle.③Insisting that prevents the principle primarily.④Insisting the quality specification the principle.⑤Insisting scientific, fair, obeys the law occupational ethics standard principle. Take the project contract, the design paper and the technology standard as the basis, to the construction preparatory stage, the construction stage, completion approval payment stage and so on constructs the entire process work quality and the project quality carries on the control, achieves the contract document stipulation the quality requirement.The communication engineering control's prime task is 4 controls: Quality control, investment control, progress control and safety control. The quality control takes the control work one of 4 essential targets, the quality objectives are very important. If the basic quality objectives cannot realize, then the investment goal and the progress goal will lose the control the significance. Especially in our country present stage, the project also occupies tries the implementation stage, the massive work are the quality control. Therefore, the quality control is in the work is most important, the most foundation work.The project quality management is the establishment and the implementation project quality policy complete function and the work content, and carries on the appraisal and improvement a series of work to its work effect, is also to guarantee that the project quality satisfies a series of measures which, the method and the method the project contract, the design document, the standard standard adopt.Dandong local network backbone link receives the fiber optics project is Liaoning Province mobile communication Limited liability company in the complex mountainous area environmental construction foundation network special project. The local network backbone link will receive for Liaoning Province in the fiber optics construction accumulation experience, thus provides the nimble convenience for the general correspondence user the communication network. Studies the mountainous area communication network construction item the quality plan to carry on the quality control, will have the positive influence to present's communication network construction work.This project working place located at Liaoning Province Dandong, the working place is scattered, divides into the urban district, the county and the villages and towns, this project placing fiber optic cable line 143 kilometers. This project is going to face each kind of test which the mountainous area construction must face, the mountainous area construction, no matter in the climate, the environment, the geography, the technology as well as the quality aspect has the big challenge, how studied completes the mountainous area construction item supervisory work to the enterprise is the essential work. The mountainous area construction has its own characteristic, certainly must act according to the special details to work out the construction quality plan, can cause mountainous area construction work methodical advance. Through studied the mountainous area construction the characteristic to work out the mountainous area construction quality plan, before the construction, has made the detailed deployment and the preparation; In the construction process carries on the careful inspection strictly according to the project quality goal to each construction link, found that the problem or the hidden danger carry on immediately to it reorganize; After the construction had ended, has made the test to the project various aspects technical specification, compiles completion document in detail, and passed Development organization's approval smoothly. The project completes smoothly, achieves the Development organization anticipated quality objectives, guarantees the communication network smooth movement.
Keywords/Search Tags:Implementation
PDF Full Text Request
Related items