Font Size: a A A

Ex-post Evaluation Of Construction Project For The Baotou Second Thermal-electric Plant

Posted on:2010-02-07Degree:MasterType:Thesis
Country:ChinaCandidate:H J ZhaoFull Text:PDF
GTID:2189360275450281Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
Establishing and perfecting the ex-post evaluation mechanism of power constuction project helps test and improve microeconomic returns and macroeffect to intensify the reform of investment and financing mechanism.This paper is dedicated to study the ex-post evaluation of power plant construction project to provide new references to that work in our country.On basis of systematic study on ex-post evaluation therory,the paper defined contents and index system of power plant construction ex-post evaluation,proposed the evaluation model on basis of successful degree and fuzzy comprehensive evaluation therory,and made the empirical analysis of Baotou Second Thermal-electric Plant expansion project.The paper carried out monomial ex-post evaluation as well as comprehensive evaluations according to the logical framework approach and successful degree and fuzzy method,then put forward practical advices on sustainable development of that project.Finally,the paper drew the conclusions and put forward contents required further research.
Keywords/Search Tags:power plant construction project, ex-post evaluation, successful degree, fuzzy comprehensive evaluation
PDF Full Text Request
Related items