Font Size: a A A

Cost Management Analysis Of Rural Grid 35 KV Substation Project In Bayannur City

Posted on:2010-04-05Degree:MasterType:Thesis
Country:ChinaCandidate:J G LiangFull Text:PDF
GTID:2189360275950511Subject:Project management
Abstract/Summary:PDF Full Text Request
Power grid project cost management is extremely essential to control the power grid project cost and realize its investment benefit.Choosing rural grid 35KV substation project in Bayannur city as research object,the paper firstly introduces the content of substation project whole-process cost management,and then by analyzing the project cost of six actual cases,the paper finds the factors influencing the substation project cost and indexes which is essential to decide the project cost.Based on it,the paper reveals 35kV substation construction cost management problems by actual investigation,and summarizes substation construction cost management experience.The achievements of this paper will provide valuable countermeasures and suggestions to the substation project under construction or proposed.
Keywords/Search Tags:Substation Project, Cost Analysis, Project Management
PDF Full Text Request
Related items