Font Size: a A A

Research On The Risk Management Of COOEC Major Equipment Procurement

Posted on:2009-03-28Degree:MasterType:Thesis
Country:ChinaCandidate:Q Y ZhangFull Text:PDF
GTID:2189360275985848Subject:Project management
Abstract/Summary:PDF Full Text Request
Based on qualitative and quantitative analysis of the method to study the theory of risk management, risk management and the scientific method applied to marine petroleum engineering major equipment procurement process, theoretical and practical case studies in the form of combining the marine petroleum engineering major equipment procurement system as a whole issue of risk analysis and the preparation of a risk-control equipment procurement manual for policy makers to make the right decisions and provide the basis for control measures, to prevent and control the maximum risk occurred after control from the past , save expenditure, procurement quality assurance.According to the above-mentioned purpose of the study and methods, the paper on China Offshore Oil Engineering Co., Ltd. (COOEC) in the procurement of major equipment in the process of risk factors for the identification, evaluation, risk control and the preparation of a manual.The full text is divided into eight chapters:Part of the preamble to clarify the context of this study, the existing research results, the purpose of the study and the significance of research methods and techniques line, and the innovation potential and existing problems, to do a good job after the exposition foreshadowing.The first chapter, on offshore oil and marine petroleum engineering status and the opportunities and challenges facing the definition of marine petroleum engineering, petroleum engineering major marine equipment, the procurement process and fundamental purchase.Chapter II, the definition of risk, risk management, the concept of risk management theory on the status quo of Chinese and foreign research, development and application of marine equipment procurement process in the risk management process.Chapter III, on the classic method of risk identification and the identification step, and the procurement of the major equipment in the course of the risk identification, the establishment of a risk factor identification table.Chapter IV, on investigation, experts estimated the risk scoring method, qualitative and quantitative risk assessment, using mathematical models of the CIM for major equipment purchases in the process of evaluating the risk.Chapter V, on risk reduction, risk prevention, risk reserve, and other specific risk control measures, application of the theory, the establishment of the procurement process for major equipment in the 1, 2, 3 Risk Control Form.Chapter VI, through a specific case of marine equipment procurement, application specific risk factor identification, evaluation, control theory and methods, the equipment procurement process established in the 1, 2, 3 risk control table, compiled risk control Manual. Chapter VII of the transcript done a summary concludes: risk management theory method has been applied to the procurement process for major equipment, from the previous passive risk management methods, equipment procurement managers make science can be conducted on the procurement process Analysis of the possible risk factors for literacy assessment, the risk of the whole project of calculation that scientific conclusions are justified decision-making support, and we can control the risk factors, thus greatly reducing losses.
Keywords/Search Tags:Offshore Oil Engineering, Equipment Procurement, Risk Management
PDF Full Text Request
Related items