Font Size: a A A

The Risk Evaluation Of The Wind-Power Project In Wu Dengshan Based On Fuzzy AHP

Posted on:2011-01-01Degree:MasterType:Thesis
Country:ChinaCandidate:L H QiFull Text:PDF
GTID:2189360305487799Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years,with the growth of wind power generation market around the world, Wind power generation technology has developed rapidly, Mw level and above Generator technologies have gradually matured. Therefore, the wind construction has been the key projects of many countries and areas.This paper introduces the risk theory and risk assessment methods, Based on the analysis of the characteristics of wind power project'risk, it research project risk factors, and established the wind project risk evaluation index system, according to the specific condition of WuDengshan wind power project.And then use the AHP to obtain various index weight, and use the fuzzy comprehensive evaluation method to establish the risk evaluation model of the wind project and evaluates the risk. Finally, the paper put forward risk countermeasures according to WuDengshan wind project.
Keywords/Search Tags:Fuzzy AHP, Wudengshan, wind-power project, risk evaluation
PDF Full Text Request
Related items