Font Size: a A A

Former Evaluation Of LuHua Thermal Power Plant 2×330MW Units Construction

Posted on:2010-07-18Degree:MasterType:Thesis
Country:ChinaCandidate:Y JiaFull Text:PDF
GTID:2189360305987777Subject:Project management
Abstract/Summary:PDF Full Text Request
Construction of power projects through the analysis of technical, economic and social benefits under a single factor analysis method, based on this paper, based on AHP level analysis and comprehensive evaluation. This theory, based on analytic hierarchy process, from the matrix consistency test, the factors level of construction, evaluation experts, illustrates the empowerment scale and so the choice of decision-making system, the impact of simultaneous analysis of power projects to determine the weight of indicators established analytic hierarchy process comprehensive evaluation model, while the deer Chinese Thermal Power Plant 2×330MW units project to study the object, by analyzing the deer Chinese Thermal Power Plant 2×330MW units project's technical, economic and social factors, will be based on AHP comprehensive evaluation method applied to the project construction instance, and through the results of analysis shows that the rationality of this method and effectiveness.
Keywords/Search Tags:power project construction, AHP, former evaluation
PDF Full Text Request
Related items