Font Size: a A A

Of Fidic Conditions, Highway Construction Claims Management Studies

Posted on:2003-08-26Degree:MasterType:Thesis
Country:ChinaCandidate:B BaoFull Text:PDF
GTID:2192360095957458Subject:Road and Railway Engineering
Abstract/Summary:PDF Full Text Request
During highway construction management by utilizing FIDIC conditions, large numbers of claim have been generated. Whether Contractor's claims management is successfully or not directly results in completion of constructive benefit. This paper, in view of Contractor, based on analyzing the main reasons, classification opportunity and Procedure of claim, it is emphasis on Studying on efficient management method of Contractor's claims and is surely worth popularizing in Contractor Constructing civil works abroad.
Keywords/Search Tags:highway, constrction, claim method manayement
PDF Full Text Request
Related items