Font Size: a A A

S Institute For Military Monitoring And Control Research Projects

Posted on:2011-05-31Degree:MasterType:Thesis
Country:ChinaCandidate:X E FengFull Text:PDF
GTID:2199330332977088Subject:Project management
Abstract/Summary:PDF Full Text Request
Modern Project Management originated in national defense, through several decades of development, it serves the national defense in a new way. But there are many management problems in the working of the national defence science institute and the development of military products.Analysis on the project management, the time management becomes the core of all the problems.This article lead the Critical Chain Project Management into the time management in the military Measurement and Control products development in S institute. The overall introduction of time management in the development of military Measurement and Control products is emphasized. The application and summary of Critical Chain Project Management in the development of military products is integrated. Clarify the unique environment of the military Measurement and Control research projects of our country, and the difference between other kinds of research projects. Put forth the Critical Chain Project Management criterion and method of military Measurement and Control research projects based on Work Breakdown Structures, illustrate the plan, detail steps and tools of Critical Chain Project Management in the development of military Measurement and Control research projects. Thus to relieve or solve the state of chaos in the development of military Measurement and Control research projects in S institute, and make the products can deliver on time. At the same time, this article can provide experience for other research institute to develop military research projects.
Keywords/Search Tags:Measurement and Control, Work Breakdown Structures(WBS), Critical Chain Project Management (CCPM), Feed Buffer, Project Buffer
PDF Full Text Request
Related items