Jingjiang Power Plant Project Cost Control Methods To Explore

Posted on:2008-04-27Degree:MasterType:Thesis
Country:ChinaCandidate:W J SheFull Text:PDF
GTID:2199360245978981Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
The control engineering construction cost should take "four entire" the control method as the basic principle, namely "the entire process, the life cycle, the entire essential factor, the whole staff participation" control method. The so-called entire process request from the plan, the design, the purchase, the construction, the debugging and so on each construction link carries on the management and the control to the project construction cost and the expense disbursement; The so-called life cycle is the use dynamic analysis method carries on the generalized analysis to the disposable investment and the unit operating cost, achieved in the entire project life cycle the expense disbursement are least; The so-called entire essential factor is the integrated control which to the quality, the progress, the security and the expense carries on, causes the risk expense minimum; The so-called whole staff participation is regardless of designs, the expense control, the purchase, the construct control, the progress management, the quality control, the safety managers all requests consciousness which sets up expense control everybody has a responsibility, the whole staff participation, reduces the cost, the control expense effectively.The Jiangsu Guoxin Jingjiang power plant project power plant plan installing equipment aggregate capacity is 7320MW, an issue of project plans to construct 2x660MW coal-burning power set, estimated an issue of project total investment is approximately 4,500,000,000 Yuan. An issue of engineering effort begins in 2008, first unit in 2010 productions.This project will use the ultra supercritical coal-burning unit, the Guoxin Jingjiang power plant becomes an energy conservation highly effective, the clean environmental protection "the green power plant".This article key carries on the inquisition project construction cost control from the Jiangsu Guoxin Jingjiang power plant item design stage and the project implementation stage two aspects, diligently optimalizing, most feasible control engineering construction cost method. Through optimizes the total plane arrangement, the craft system arrangement and the construction structural style, carries out the quota design reasonable establishment project to budget and so on the measures vigorously to reduce the disposable investment expenses generally, achieved the system efficiency is high, entire life cycle cost minimum. Through the project implementation process control, achieved to incurs the bid, constructs the entire process, the construction final accounts active control, reduces the project construction cost diligently...
Keywords/Search Tags:Project construction cost control, The design control, construction organization controls
PDF Full Text Request
Related items