The project pricing method of china's construction enterprises developed from fixed budget to engineering quantity list pricing. With economics' development, the fixed budget based on industry standard can not meet the enterprise's requirements and the engineering quantity list pricing, which reflects the enterprise's own cost, is eagerly needed. The precondition of the engineering quantity list pricing requires the enterprises have their own quotas. Most of china's construction enterprises don't have enterprise quotas related with their own Level of productivity, they are also lack of material generated during cost accumulation period, so enterprise quotas must be made as soon as possible, so that enterprise can adapt to the engineering quantity list pricing model.This paper provides an overview of the research status of enterprise quotas, analyzes several methods of enterprise quota china's enterprise often used, proposes to build up a database for the finished project cost, to manage the data of the construction enterprise's project cost, and design an example database for the construction enterprise based on the data for the finished project. Then I mainly propose a fast, convenient method to make enterprise quotas, using Monte Carlo simulation Technology, and prove this method is applicable with an engineering example, and provide Theoretical basis and method of operation for construction enterprise. |