Join in the WTO, the level of risk management and quality of engineering project have more claims. In these, risk control is very important in risk management. Now in our country, means of risk control is only simply transferring the risk to contractor or subcontractor, it is not enough to deal with the risk that may be met in the engineering project. So it needs more foreign advanced methods of risk control, e.g.: engineering insurance and engineering surety. These are very important for the risk control of our construction project. |