Research On Risk Management Of International Petroleum Engineering Project Under EPC Contract Mode

Posted on:2017-05-03Degree:MasterType:Thesis
Country:ChinaCandidate:B LiuFull Text:PDF
GTID:2209330485453079Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Due to the continuous development of Chinese construction company, and on the construction of overseas business process speed and strength of ascension, the international project contracting market in the enterprise development and the operation of the standard as a result, there have been improved. By comprehensive benefits, resource allocation, and owners to various factors, such as the EPC general contracting mode has become a model using high frequency on current international, an increasing number of experts and scholars to join into the study of the model. In terms of the current Chinese construction companies, how to evade risks has become the urgent problem.At present, EPC general contracting project risk management research in China compared with foreign developed countries only belongs to the initial period, so this topic of international engineering EPC general contracting project risk research and analysis, to our country construction enterprise in the international market in terms of business development, have certain help, and have practical significance and value.This topic is the contractor has introduced four aspects of the content of the research and analysis, detailed as follows:(1) On the basis of EPC general contracting project risk in all kinds of content, implement the general contracting mode to the comprehensive study of the risk, such as frequency, influence degree and stage risk, etc.(2) the use of the study of three factors, build the contractor risk perspective, and finally achieve the international engineering EPC general contracting project points clear of risk identification list;(3) in the international engineering EPC general contracting project risk research, add a new type of analytic hierarchy process (AHP), and take the corresponding results, but also realize the risk response measures and solutions;(4) The international engineering EPC project risk emergency the preliminary research and establish emergency management system;...
Keywords/Search Tags:International engineering, EPC general contracting mode, Risk management, Analytic hierarchy process(AHP)
PDF Full Text Request
Related items