Responsibility For Cost Of Road Construction Projects Pre-control Mechanism

Posted on:2007-11-09Degree:MasterType:Thesis
Country:ChinaCandidate:Y H CengFull Text:PDF
GTID:2209360185481652Subject:Road and Railway Engineering
Abstract/Summary:PDF Full Text Request
To gain the benefit is the final aim of the development of the enterprises. At present, the construction enterprises face two major difficult problems in management and administration. First, under the condition of fierce market competition, enterprises exploit outside market and solicit the project task. Secondly, how to reduce the construct cost at a low bid, increase the profit space, and get the existence and development of enterprises. How to reinforce the construction site management, reduce the costs of construction, improve the economic benefit? This is the common desire and drang of our country's road construction enterprises. As the center of the enterprise's costs, management department must successfully control the costs, reduce the costs of the construction, and create the maximal economic benefits of the enterprise.This article combines the kangyadi's bridge reconstructive project of highway between huangling and yan'an, and explores practice of responsibility cost management in management department. Mainly discusses the costs control of construction management department, put forward the writer's own opinion about the organization structuring of management department, optimizing the scheme cost of construction, disassembling the responsibility cost of construction item, controlling the material cost. And has done in-depth studying in the application of the value project on optimizing the cost of construction scheme. Especially earnestly analyze the interior and exterior environments of management department, and reasonably setup the costs control targets, then construct according to the targets and disassemble it to every responsible unit and individual so as to distinct the costs responsibility. Thus bring every department and circle as well as the whole staff into a vertically and horizontally concerted costs control system with common endeavor direction.This article bases upon the research achievement before, it does some innovation, such as: we utilize the theory of value project to select the construction scheme, and analyze and direct the construction job, consequently controlling the cost in advance, gaining the charge of scheme in advance; research computer assistant system of optimizing the scheme cost of construction and controlling the material cost, in order to process and coordinate the data, use modern measure to workout report forms and analysis forms in time and nicety.
Keywords/Search Tags:road construction project management, responsibility cost, charge-in-advance mechanism, the theory of value project
PDF Full Text Request
Related items