Font Size: a A A

Based On The Pmmm The Erp Project Implementation Of The Process Capability Maturity Studies

Posted on:2007-08-08Degree:MasterType:Thesis
Country:ChinaCandidate:H WangFull Text:PDF
GTID:2209360185963573Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
On Oct. 10th, 2003 the standard of electronics field "The First Part of Technical Regulations on Enterprises Information: Regulation on Enterprise Resources Programming System (ERP)" was approved to be enacted by Ministry of Information and Industry. From then on ERP has gone into another rapidly developed and applied period with the promotion of the government, the passion of the enterprises, the development of the ERP manufacture as well as the promotion of the media. To bring the advanced management thinking contained in the ERP software into full play and to ensure the success rate of the implementation of the ERP system, the basic work is to analyze the process of the implementation of the ERP system. Considering the current limitation to the research on the competence level of the involving parts of the ERP implementation, this essay newly defines and divides the process of the ERP implementation and introduces PM3 into the research frame of the mature rate of ERP implementation competence, according to the process thinking of program management. Meanwhile, this essay has established a new model system and proposed a complete means of assessment.First of all, this essay combs the research result of the PM3 and the competence mature rate model of enterprise ERP implementation (ERP-CMM) and distinguishes the necessity of the application of the process thinking in the ERP implementation program. It newly divides the general process of the ERP implementation into five sub-processes: startup process, plan process, implementation process, control process and ending process which clarify its inner logical relationship by using the program management thinking. Apart from that, this essay first combines PM3 and ERP-CMM together, establishes the PM3 and ERP implementation competence mature rate model which includes the target system obtained by the subjection rate and relevant statistics analyze of the filtering results of the basic targets the experts have chosen, to access the target system of the mature rate degrees of every implementation involving part, and the key process zone and the foreseeing aim of the different mature rate degrees according to the inner frame of the new model. At the same time, it also proposes quantitative and qualitative means of assessment of the mature rate degrees aiming to different involving parts and newly defines and describes the level conditions of different mature rate degrees. Finally, this essay adopts the ERP implementation competence mature rate assessment target system and its key process zones facing software producing or supplying manufactures to specifically access the ERP implementation competence mature rate of YONGYOU software in the ERP implementation program in Company.
Keywords/Search Tags:ERP-CMM, PM3, appraisal index system, key process area
PDF Full Text Request
Related items