Font Size: a A A

Research On The Installing Standardization Of Large Oil-immersed Power Transformers

Posted on:2012-11-16Degree:MasterType:Thesis
Country:ChinaCandidate:Y Z ZhuFull Text:PDF
GTID:2212330338468701Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
The installation quality of the large power transformers directly influences the safe and stable operation of the transformers. On the basis of the national standard of power transformer installation, new construction technology and construction methods are innovatively developed and used. Through strictly controlling the transformer vacuum breaking, attachment installing, vacuum oil filling, hot oil circulation and transformer electrical test, and using the optimal construction methods suitable for environment, the transformer installation quality is greatly improved. Through analyzing the problems of large faulty transformers in substations in recent years, a key control installation is applied to the large transformers to eliminate hidden faults. The recovery of the factory insulation and transformer oil processing ensure the long-term and stable operation of the transformers after put into operation.
Keywords/Search Tags:Power transformer installation, factory insulation, vacuum oil filling, hot oil circulation, electrical test
PDF Full Text Request
Related items