Highway Construction Project Coordination Optimizing Management

Posted on:2012-09-04Degree:MasterType:Thesis
Country:ChinaCandidate:R S GuanFull Text:PDF
GTID:2212330362454234Subject:Project management
Abstract/Summary:PDF Full Text Request
Global economic integration promoted world's high-speed economic development, increasing competition, changes and problems with opportunities and challenges. Along with our country's rapid economic development, national continuous on highway construction especially highway construction increased investment, highway engineering construction projects, China launched large-scale traffic career realized the stepping-over development, by the end of 2009, China has reached highway mileage 382.8 million kilometers, including highway 6.5 million kilometers, high-speed road skeleton has formed. Project management technology since the introduction and application in highway construction, has achieved remarkable results.Project management is throughout the whole process of highway construction, project control system is dynamic control process, the dynamic effects of controlled by inspecting and supervising, timely discovery and corrective control deviation, then to the control condition improvement, achieve system control targets.The highway engineering project control system is a complex compound system, by their respective subsystem structure, its system respectively by their respective plans and implementation of subsystem structure, subsystem with their relatively independent and specific operation objectives and functions. In a sort of sense, one-sided will one of them as the general target, will weaken the system's overall function, the pursuit of a single goal will cause land-sea-atmosphere low on the coordination degree, and can produce negative effects, because between subsystems is through mutual infiltration and interrelated, interaction coupling for one kind function than subsystems function of the sum of the new integral effectThis review focuses on the construction project management system of quality, schedule, cost, safety each target control correlate, interaction and mutual constraint, mutual development and complementary relationship of unity of opposites, focus on analyzing the collaborative optimizing their relationship, and find out the quality, schedule and cost, safety of a comprehensive balance, carries on the benign circulation, make the highway construction projects to achieve high quality, fast progress, low cost, safety of quality engineering project total goal.Combining with the actual current highway construction and construction case, confirmed through optimization of coordination with rationality and adaptability of construction project management, just have its value and vitality. It confirmed that working hard for progress, creating for benefit, and gaining development based on the premise "safety first" and "quality is more important than mount tai".
Keywords/Search Tags:highway construction, project management, coordination and optimization
PDF Full Text Request
Related items