Study On The Management Of Construction Project In Third Tenders From Pengqing Highway

Posted on:2017-08-14Degree:MasterType:Thesis
Country:ChinaCandidate:L LiFull Text:PDF
GTID:2322330518953391Subject:Engineering
Abstract/Summary:PDF Full Text Request
By 2030 the total size of the national highway network of about 118,000 kilometers,18,000 kilometers planned another long-term prospects lines.Currently Generally speaking,although tensions eased transportation in general,the bottleneck factors basically eliminated.However,compared with the current expansion of domestic demand,the development of the real economy and improve people's livelihood needs,the total size of the transport infrastructure is still insufficient.Requirements and economic and social development and people's demand for higher quality in comparison,there is a big gap.?This article will Pengqing ? Contract Section of Highway Construction Project Management instance mouth,using the theory of knowledge and methods of highway project management,analysis and study of its project construction management process,establish a set of scientific and reasonable construction project management,to mention Gao construction enterprise project management level.?Management noted that the construction contract section ? Pengqing Highway existence LAR delays,design drawings deep enough,schedule delays,extensive project management and a lack of information and so on,and analyze this contract,the cause of the problems.?Combined with the actual characteristics of the project,describes the overall goal of project management,management principles,and regulatory agencies.Management responsibilities are summarized in the various functional departments,and a detailed description of the construction management and coordination of the various functional departments.?This chapter Pengqing Highway to the construction quality of roads,progress,security,civilization,environmental protection,cost management system were explained,focusing on policy measures speaking,management measures.?Proposed file management on the importance of Pengqing highway construction management,records management division of the construction organization,standardize the scope and responsibilities of records management,and clarification of its management measures.?Pengqing highway the construction quality of the third section of the contract works,progress,safe,civilized environment,cost,records management effectiveness were evaluated.The results show that the project has reached the level of quality of the project,described the five programs mentioned in measures feasible.
Keywords/Search Tags:highway engineering, project management, file management
PDF Full Text Request
Related items