Font Size: a A A

Elaborate Courses Website Project Management Research And Practice

Posted on:2012-04-11Degree:MasterType:Thesis
Country:ChinaCandidate:J DongFull Text:PDF
GTID:2217330362458823Subject:Project management
Abstract/Summary:PDF Full Text Request
Elaborate courses are distinctive and world-class teaching demonstration programs. Website is one of the essential components. And the quality construction of the course website for a project than if it needs to be knowledge, skills, tools, technology applied to the project, to the project end of the requirements and expectations. From the beginning, implementation, until the end of this process is related to the project management process. Formerly there is only one speaker and then contains a number of part-time teacher or staff to complete the whole course of the design, construction, etc., but with teaching technology, continuous improvement of standards of quality courses, one or more of the energy is often enough, which requires a team to complete, and in order to improve efficiency, a reasonable time and budget planning, the introduction of the concept of project management it is very necessary.At first, this article analyzes a quality course construction site found in previous issues, building on the excellent course site features and key technical points are discussed. That the project needs analysis, time management, personnel management and organizational change management needs. Construction on the project site has a fine guide. Taking into account the characteristics of fine construction site, the cost composition including equipment cost and development cost, because the equipment costs are relatively fixed, cost management relied mainly on the development progress of the administration, will result in the construction site due to cost control, time (schedule) management. Fine site and course construction because of the need to cooperate closely with the implementation requirements often change and people involved in management and coordination problems, so, this article focused on the needs of people management and change control.We can know the network construction projects in the project characteristics, management structure and key elements, this article describes the specific implementation of a process of quality sites, focusing on four key elements of the implementation process, that is, time management, project personnel management, project change management and project safety management. Project Time Management for the smooth implementation of the project and are particularly critical. CPM critical path by using the method, the pre-project time schedule and estimated duration of project activities, specifically, how to control the project schedule to ensure timely completion of the project. Detailed project management, time management in the concrete implementation method, the first complete work breakdown structure, determine the work activities of several units, and then sort of work, the estimated time for each unit of work, reasonable arrangements for the project schedule. Then all of the site project organization and management of the factors summarized in the discussion. Institute of Management describes the impact of the project, project team members and the impact of the composition and team communication. Change management, project time management of site specific factors, such as the impact of the programmer, duration of time changes, iterative characteristics and other factors. After the introduction of the project implementation progress in the control measures, including schedule, program implementation, progress control, progress report. Course Website as an open education web sites also set forth requirements for security management. Focus on description, and the need for security authentication, and Web security risk and coping strategies. To achieve the intended results of the practical implementation of the development objectives of the project ahead of schedule.Finally, a summary of the text, namely the introduction of project management tools can help quality course Web sites, through the needs analysis, schedule control, personnel management and organizational change management needs to avoid these as the theoretical foundation course under construction in the past The disorder occurs and blind of, the future construction of other quality courses is also a good reference. And site construction is completed at the same time also need to update the daily maintenance, the content has not yet resolved.
Keywords/Search Tags:Elaborate Courses, Website Development, Project Management, Time Management, Personnel Management, Change Management, Security Management
PDF Full Text Request
Related items