The open-pit slope stability is the important factor of production safety. Along with theopen pit mine enter the deep mining stage, formation of high and steep slope. On high and steepslope instability research is particularly important theoretical and practical significance. In thispaper, using the most advanced intelligent total station (TM30) for open pit mine roof slopedeformation monitoring, analysis and prediction of landslide, landslide disaster for control andensure mine safety production and provide a theoretical basis.With the computer, we can strengthen the management and analysis of the real-timeinformation data to monitoring the side slope in the coal mine. It is a necessary requirement foradapting to the modernization, the high management and the high standardization of informationmanagement on side slope in the mine. The system is developed basing on above ideas. Weselect the Microsoft Studio2008to develop the system and choose the powerful data base SQLSERVER2005. It has following advantages: large storage, high speed and quick datatransmission. Due to the information management of slope monitoring is a trivial, complex andmeticulous work, so it never allows any error in each work link. Moreover, manual operationwill waste a good deal of staffs’ time and effort. But the monitoring system can avoid the aboveproblems well.The system not only makes the information data accurate, but also can calculate and analyzeall kinds of data related to the slope monitoring anytime. |