Font Size: a A A

New Railway Line Construction Project Management Of Problems And The Solutions Studied

Posted on:2013-08-13Degree:MasterType:Thesis
Country:ChinaCandidate:H P NingFull Text:PDF
GTID:2232330395953321Subject:Traffic and Transportation Engineering
Abstract/Summary:PDF Full Text Request
The railway construction is to accelerate infrastructure construction, key construction projects, the national economic growth, to achieve the goal, and comprehensively improve the quality of life, promote local economic development along all of great significance. In leaps and bounds during the height of railway construction, and how to ensure that rail construction is high quality, safe, fast and fulfill the very important. To achieve the quality and quantity of the railway project a comprehensive and in-depth analysis and research, a systematic understanding of the problems in China’s railway construction project management and to seek its countermeasures, it is necessary in railway construction, and this will further deepen the reform of the railway system, standardize and improve the railway construction project management, improve the management level of the railway construction project will have important practical significance, the actual work will also have positive significance.The construction of West Rail package (Shan xi), construction of new lines of railway construction levy demolition, design management, construction plans, audit problems, combined with project management department, construction management and coordination of railway construction management study. First, this paper defines the concept of starting and then summarized the issues in the type of the new railway line construction:Second, it analyzes the impact of the various types of problems for the construction of new railway lines, and then find the reasons for each problem seek the solution to the problem; Finally, based on analysis of research on the issues, and propose appropriate solutions, and then package West (Shan xi) construction of the railway as an example to demonstrate solutions to problems in the actual railway construction projects applications.
Keywords/Search Tags:Construction of new lines, Sign demolition, Coordination, Audit, Combinedwith the Department of Management
PDF Full Text Request
Related items