Font Size: a A A

Feasibility Research Of11OKV Power Transmission And Transformation Project Of Nenjiang JiuSan Power Net

Posted on:2014-02-13Degree:MasterType:Thesis
Country:ChinaCandidate:Y F QiFull Text:PDF
GTID:2232330395994570Subject:Project management
Abstract/Summary:PDF Full Text Request
According to the state council general office of the country [1998] no.134"under the state council on forwarding the state planning commission about the transformation of rural power grid, the reform of rural power management system, realize the network with the same price for instructions notice [1998] no.2135document, as well as the province of rural power grid construction work conference spirit of instruction, in order to realize" two change "on a planning objectives, to power supply area of heilongjiang JiuSan power transmission and substation, power distribution equipment to conduct a comprehensive planning and transformation, nenjiang110KV power transmission and transformation construction engineering belongs to one of the construction project. This project will promote the implementation of the nenjiang farm, shanhe farm, seven stars, the development of economy and the improvement of people’s living standards, and to reduce farmers’ burden, improve the quality of power supply and play an important role to reduce losses.In this paper, we use the system Investment Decision Analysis‐a feasibility study of the project, before the investment decision of the project, its relevant aspects, such as technical, economic, risk comprehensive, we give integrated research, forecasting and analysis, its reasonable technical and economic evaluation, thereby reducing losses and waste in the process of project construction time, improving investment returns, and solving practical problems, relieving farm power supply situation, improving the quality of power supply, reducing the loss of high‐voltage lines, improving the reliability of power supply, provide important reference.The structure of the paper is divided into six parts. The first part is an introduction, describing the research background, significance. The second part is related to theoretical overview of the project feasibility study. The third section describes the sub‐evaluation of the Nenjiang power transmission project profile and project feasibility study. The fourth part of the project is from the perspective of the national economy and social feasibility analysis. The fifth part, the project’s environmental impact is evaluated. The sixth part, we did the project feasibility analysis from the angle of risk. The seventh part summarizes and puts forward related suggestions.
Keywords/Search Tags:Feasibility study, Power Transmission and Transformation, Social economy, Riskassessment
PDF Full Text Request
Related items