Font Size: a A A

According To ESPM New Angle Of View Of Engineering Item Progress Plan And Control Research

Posted on:2013-01-04Degree:MasterType:Thesis
Country:ChinaCandidate:X F HuangFull Text:PDF
GTID:2249330362472827Subject:Business Administration
Abstract/Summary:PDF Full Text Request
This text with synopsis ground analysis the real estate develop the background ofvariety currently bottom, item management of business enterprise management to ownersquare request.Put forward owner the square should take the strategic target of company ascenter under the strategic angle of view and plan a homework to in multiple layers resolveand finally pass an item plan the control carry out item target to attain the meaning that thestrategy management combines with item managementThis text combines the development of five good luck gulf No.1small areaengineering items in the garden in Xiamen to plan to manage a case, the article discusses aratings and owner that the real estate business enterprise plans a management to the itemsquare’s item management in ESPM under the strategic angle of view, draw up reasonableengineering item progress plan.Manage three greatest targets with the engineering item thecontrol relate to in, the progress is a center, draw up superior can go a constructionprogress plan, and adopt to organize measure deployments, such as measure, techniquemeasure, contract measure and information management...etc. to the resources arrangementof engineering item.Pass to plannedly draw up a method such as:Key circuit, sweetespecially diagram, the horizontal way diagram makes use of and the progress dynamicstate control principle and plan to the actual progress and the progress inconformity,produced deviation of, apply the method of system the everyone to the analytical influenceprogress noodles factor, find out necessary adjustment measure.To the minimum andresources depletion in construction time of balanced the economic efficiency for turning to then raise an engineering construction, and in multiple layers draw up the comprehensivecontrol measure of total target, stage target and node target according to the managementresponsibility, look for to find time with effect of the best combine a point, attain item ofthe effect of finally strategic plan.
Keywords/Search Tags:The allotment that is excellent to turn a resources, The progress dynamic statecontrols principle, item progress plan and control, Time and effect of the best combine apoint
PDF Full Text Request
Related items