Font Size: a A A

YD Communication Company Boss Billing System Project Risk Management Research

Posted on:2013-05-22Degree:MasterType:Thesis
Country:ChinaCandidate:Y F LiuFull Text:PDF
GTID:2249330374456052Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the rapid development of Shanxi communication market and a number of operators in the fierce competition, in order to improve the YD communications company, management level and service quality, meet the growing wealth of customer demand and quality and efficient service concept, the Boss two system from a" mobile information expert" overall development strategy of the enterprise from the point of view of the project planning and construction, construction of next generation Boss business operation system. Boss two phase system due to build specialization, integration, scalability of the operation support system, construction involves many departments, range is wide, participate in the administration and maintenance of many manufacturers and developers, construction cycle is long, a link is not standardized or omissions, will give the entire project implementation risk, so the the project carries on the science reasonable risk management, to minimize or avoid project development risk, for Boss two project smooth acceptance is very important.The thesis consists of six chapters, the first chapter introduces the study background and significance, introduces the research train of thought, research method and thesis structure; the second chapter on the project risk management theory are reviewed and the research, introduces the risk management of the six major processes, focusing on project management software of the four classic models are described and compared, study for the project risk management tools and methods. The third chapter of the Boss two project basic situation, construction principle and construction to achieve goals were introduced, focused on the Boss two project system architecture and modules to achieve the objective function; the fourth chapter of the Boss two project characteristic risk management study and summing up, identification and evaluation of Boss two period project in demand, technology, communication, management of four aspects of risk present situation and the characteristic, need to strengthen the construction project risk management measures; the fifth chapter according to the business operation support system of practical maintenance features, analysis process will encounter risks, with emphasis on how to conduct risk strategy implementation and monitoring methods; sixth chapter:review and summary, points out that the innovation point of the thesis and the research process exists limitations.Article on the six major risk management process and risk management software are introduced and compared, find suitable for the project risk management tools and applied to practical work, the use of theory with practice, on the project risk management technology to conduct in-depth research, and system integration project risk factors were analyzed, summarized a set of information system project management risk management method, the communications industry to have draw lessons from a meaning similar to project risk management.
Keywords/Search Tags:Communication company, Boss two, charging system, riskmanagement
PDF Full Text Request
Related items