Font Size: a A A

Feasibility Study On The Interchange Bridge Project Of Beijing-Shanghai High-Speed Railway And Municipal Roads

Posted on:2013-01-01Degree:MasterType:Thesis
Country:ChinaCandidate:S H ZhangFull Text:PDF
GTID:2249330392953372Subject:Project management
Abstract/Summary:PDF Full Text Request
Tianjin’s municipal roads and liaison line of Beijing-Shanghai High-speedRailway is an important part of the city’s infrastructure construction, which owns thecharacteristics of most construction projects possess, the characteristics include largeamount of investment, long construction duration, high investment risk, and itsirreversible. For these reasons, undertaking feasibility study on the interchange bridgeis vital important before carrying out. The thesis, oriented feasibility study of liaisonline of Beijing-Shanghai High-speed Railway, analyses its feasibility from technology,economy and environmental protection aspects, includes8parts, namely, number one,to elaborately explains the project’s background and significance, and to brieflydemonstrates the development of the feasibility study within and outside the country;Number two, to expound the theory of feasibility from concept, application, basis andcontent; number three, to systematically analysis the necessity of the projectaccording to the natural conditions and social economic conditions, to provideinformation for the decision-making of the project through market survey; numberfour, to demonstrate the construction feasibility through summarizing the planninglayout, construction scheme, energy-saving plan, as well as its environmental impact;number five, to closely analysis national economic benefit and cost vice verse theproject will bring from the nation’s general interest aspect and resources reasonableallocation principle through parameters evaluation method. The project’s sensitivityanalysis shows the construction of Guangqiao Road bears certain risk-resistant ability,and it is feasible economically; number six, to analysis the project’s social impactfrom adaptation and social risk; number seven, to put emphasis on the analysis ofpotential risk factors of the project, and to propose measures accordingly; numbereight, to draw a clear conclusion that interchange bridge project of Beijing-Shanghaihigh-speed railway and municipal roads is feasible. The study reemphasizes theimportance of feasibility analysis which helps to promote the nation’s constructioninvestment profits, and to avoid investment failure.The thesis begins with the fundamental theory of feasibility study, to analysis theactual conditions of the project at a maximal extent, and to estimate the feasibilityeconomically and technologically, and to put forward practicable suggestions andmeasures for the problems found during the analysis. The theory and method in the thesis also have some instructive significance for the construction of other municipalroads and interchange bridges of the country.
Keywords/Search Tags:feasibility study, evaluation on environment impact, evaluation onnational economy
PDF Full Text Request
Related items