Font Size: a A A

The Feasibility Study Of Ras Al Khaimah Coal-fired Power Plant's Investment Project

Posted on:2010-02-07Degree:MasterType:Thesis
Country:ChinaCandidate:G Z HuangFull Text:PDF
GTID:2189360275984759Subject:Project management
Abstract/Summary:PDF Full Text Request
Electric power industry with the national economy is important to basic industries, power ups and downs of the growth of fluctuations of the national economy has a direct impact on the world economic development strategies focus on the development of the priority target. In recent years, every country in the increase of electricity investment, and promote the development of power industry. Power as high-risk industries, not only from their public utility property, as well as capital-intensive technology, the instantaneous balance between supply and demand, production and other characteristics of continuous operation, while a huge amount of power project investment, long construction period, sunk costs are high.This article describes our country the first Henan Thermal Power Construction Company and the United Arab Emirates Ras Al Khaimah to do a joint venture for coal-fired power plant project, according to preliminary information, and our existing in previous construction projects substantial accumulated successful experience, we think, we are fully for the project has the capacity to provide a complete and sophisticated project-building programs.
Keywords/Search Tags:feasibility studies, economic evaluation, BOT mode of financing, risk analysis, fuzzy evaluation method
PDF Full Text Request
Related items