Font Size: a A A

Study On Risk Management In International Construction Project

Posted on:2014-02-15Degree:MasterType:Thesis
Country:ChinaCandidate:W B DengFull Text:PDF
GTID:2249330395999172Subject:Project management
Abstract/Summary:PDF Full Text Request
The risk is everywhere, the ever-present. Each project will be put at risk, every business will encounter risks, especially foreign construction company in project management. It is necessary to enable domestic company to choose the reasonable risk identification, risk assessment, risk planning, risk treatment and risk oversight for the domestic construction company in foreign project risk management process to achieve better control of risk, managing risk. Depending on the characteristics of the project, in the International Project of the risk management process, taking a different risk management models and a variety of forms of organizational structure to ensure that company can better avoid risks, reduce losses. It was from several aspects, foreign project risk management process presents some discussions on the domestic construction company.This article consists of four chapters, in the first part of the thesis, the origin of risk management, the definition and characteristics of risk management are expounded. The article based on the construction company’s point of view, It should be given full attention that introducing the theory and method of the project risk management system to the company.In favor of the domestic construction company in foreign engineering projects for operating the effective risk management, the domestic construction company need to adjust the organization structure formed in the process of domestic project. In addition to, introducing the model of the construction company for operating the risk management in the international project.In the fourth part, the whole process of risk management consisting in the five work has carried on the detailed. The basis of a risk management work is carried out for risk identification, risk identification method has a lot of kinds, specific to foreign engineering project, this paper provides seven ways for foreign engineering project operation risk identification. Based on accurate recognition of risk, and preliminary assessment and analysis of different types of risk, and document risk factors investigation list. Among them, the risk analysis and assessment of the use of expert experience method, the monte carlo simulation method and risk state chart method. For enterprise experts’different assessment results, detailed planning concerning foreign affairs in the process of engineering project risk, and adopt different processing method to deal with different categories of risk. We have a lot of ways to treat the risk, here, we mainly introduce the following six kinds of risk management: risk loss control, risk retention, risk aversion, risk dispersion and risk transfer and risk. Risk monitoring is the last phase of the process of risk management in the foreign-related project. In the process of project, setting up the risk management department in the construction enterprise or recruiting the specialized risk management intermediary supervision the risk at any time, in response to the end of the project at different stages of different types of risk that may occur. Throughout the entire project at the end, we summarize the experience to prepare to build the long-term risk management mechanism for company.The risk management process is a dynamic process, each stage is not isolated, there is a strong correlation between each other, and is a cyclical process. The article concludes with several points in the domestic construction enterprise international risk management process needs to be improved.Domestic construction enterprise for international construction project risks is still lack of comprehensive and systematic analysis, make it a success profit bottleneck of domestic construction company. Due to the study of risk management started late in China, the domestic construction company to carry out foreign engineering project risk management research are much rarer, and risk management must be key research direction in the international construction market, therefore, for the domestic construction company for foreign engineering project risk management research is of great significance.
Keywords/Search Tags:International Project, Risk, Risk Management
PDF Full Text Request
Related items