Font Size: a A A

The Feasibility Study On Phase Ⅰ Project Of LZKC Company Gold Floatation Plant

Posted on:2014-07-25Degree:MasterType:Thesis
Country:ChinaCandidate:C WangFull Text:PDF
GTID:2251330425465392Subject:Business administration
Abstract/Summary:PDF Full Text Request
Gold is a special commodity with money and general merchandise of the multiple attribute, the status and function of any commodity can not be substituted,which play an important role in the international financial field, is the main elements of the global currency reserves. Gold as an important reserve supplies of the world’s largest circulated the noble metal and the state, the market development space is enormous. China is a massive importer of gold. A large amount of goldis imported a year since1997, and imports rise year by year. So there is a scarcity of domestic gold market demand and more must be produced. In recent years,many enterprises put more emphasis on gold resource developing amid the stimulusof the market.This article researches the800t/d phase I project of LZKC company which hadready to go. LZKC company (a subsidiary of Heilongjiang XX mining investment anddevelopment group) is located in Huana country Heilongjiang province, flat,transportation facilities. Planned mining and dressing plant is located in Tuoyaozi townHuana country, and forest land is in HuaNa forestry bureau’s jurisdiction. The factorycovers an area of0.015square kilometers. A simple highway through the mining area,plant area, the traffic is more convenient. Work area is located in the greater Hingganmountains Huzhong area and the new forest region, and the new forest region under thejurisdiction of administrative divisions is Huzhong area. LZKC company obtained theright of exploration on December17,2008.We investment estimate and the strength of the company’s strength by usingbusiness operation management tools, according to the present situation of mineralresources, geological structure types of mineral deposits, construction scheme,environmental protection, arguing the economic benefit, social benefit and ecologicalenvironment of Lzck compan800t/d phase I project. mainly through several aspects of the feasibility study of the project as follow: Feasibility study on marketFeasibility study on the market mainly includes the analysis of market demand andthe price of gold on two aspects. According to the domestic and international goldmarket, analysis of supply and demand of the domestic gold market and the next fewyears gold market demand trend, and the change in the price of gold and gold pricechange factors analysis, discusses the feasibility of the project market.(1) Feasibility study on resourceThe project has run three year’s exploration, including geophysical and geochemicalexploration, analysis, testing and engineering survey geological work. Over the threeyears,20million yuan is spent in exploration, building a total investment of66millionyuan, which has proven the intrinsic economic resource control (332) the amount ofgold, silver3.56t142.50t; the amount of intrinsic economic resources inferred (333gold,silver161.67t4.04t). Prospective intrinsic economic resource (334) gold, silver500t10-15t. According to the resource feasibility project evaluation of these preliminaryexploration results.(2) Feasibility study on economicTo calculate the after tax annual total profit, the project from the economic angle ofincome the profit rate of investment, a preliminary prediction of the project profit values,and then calculate the project technical and economic indicators, including the projectinvestment payback period, net present value, internal rate of return, and the analysis ofthe project through the sensitive, computing project resulted in a20%reduction in priceyield product, product, production costs increased adverse conditions of20%internalrate of return, risk resisting ability assessment project.(3) Feasibility study on ecological environmentThe production process of a mining project will be generated in the production ofmine water, sewage, noise pollution source of life and the environment, and improperhandling can cause environmental pollution. The exploitation of ore tailingsbeneficiation process through the rest of the is a big source of pollution. Whether theimplementation scheme to evaluate projects of environmental protection in accordancewith relevant state laws, security laws, environmental protection, production safety andindustrial hygiene regulations, ecological environment analysis of the feasibility of theproject.IV...
Keywords/Search Tags:Au-Ag deposit, The feasibility study, Economic evaluation, The ecologicalenvironment analysis
PDF Full Text Request
Related items