Font Size: a A A

Research On Standardization Of Valuation System Of The Bill Of Quantities In Guiyang Urban Rail Transit Project

Posted on:2014-10-23Degree:MasterType:Thesis
Country:ChinaCandidate:J J AnFull Text:PDF
GTID:2252330398990219Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
The code of valuation with bill quantity of construction works (GB50500-2008) stipulates the construction projects that all or most of investment are state-owned funds investment, must evaluation in the bill of quantities. But untill now, the code of valuation with bill quantity of urban rail transit projects has not yet published. Most of construction projects evaluation based on The code of valuation with bill quantity of construction works (GB50500-2008). In consideration of the insufficient applicability, urban rail transit projects evaluation based on The code of valuation with bill quantity of construction works (GB50500-2008) may lead to mistakes, missing in the measurement and valuation.To alleviate the workload of work out bill of quantities in urban rail transit projects; improve the accuracy of bill of quantities; reduce disputes of projects measurement, payment and settlement, and achieve effective control of construction funds. Simultaneously, to play a further role in bill of quantities, sum up the experiences of working out bill of quantities in1st and2nd line of Guiyang urban rail transit projects, and strengthen the control of the investment to the follow-up line. It is necessary to work out a complete and gradation-clear code of valuation with bill quantity of Guiyang urban rail transit projects.Focusing on the issues above, this paper conducts the following research:1. Determination of decomposition principles of items framework in bill of quantities. It is a crucial step to determinate items setup framework before the standardization of evaluation system in bill of quantities, and it is the basis for price determination in bill of quantities. The core to determinate items setup framework is Determination of decomposition principles of work breakdown structure(WBS). The items setup framework can be determinate by analyzing The code of valuation with bill quantity of construction works (GB50500-2008) and The budget quota of urban rail transit works(GCG103-2008). In order to supplement missing items in bill of quantities, it is also important to consider the actual situation of Guiyang urban rail transit projects.2. Determination of the description methods of which are used to determinate the comprehensive unit price in bill of quantities. After determination of items setup framework in bill of quantities, the way to determinate the comprehensive unit price in bill of quantities is the key to the bidding. Items characteristics working as the interface between bill of quantities and budget quota, need to standardize the description methods and principles. This paper will realize goal by determination of concept and principles of items characteristics and causality analysis.Though the study, this paper obtains2results:items framework and description methods of items characteristics in bill of quantities apply to Guiyang urban rail transit projects. The study of this paper will lay the foundation of evaluation in bill of quantities of urban rail transit projects.
Keywords/Search Tags:Urban Rail Transit, Bill of Quantities, Items Framework, Items Characteristics, Standardization
PDF Full Text Request
Related items