Font Size: a A A

The Study Of Bill Of Quantities In SC Buildding Project

Posted on:2013-02-15Degree:MasterType:Thesis
Country:ChinaCandidate:S R LuFull Text:PDF
GTID:2212330371494946Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Along with our country market economy system gradually established, in the global integration of economic background, implementing the quantities bill valuation is our country to the inevitable result of the market economy, it is effective to maintain the construction market order of one of the most important measures. Since2003, China promulgated the "construction engineering the quantities bill valuation standard" since, made some achievements, but in the long run, because our country under the planning economic system of the Soviet union before a budget system, in our mind has formed a deep-rooted influence, want to completely change the situation, and quite a long way to go.Foreign implementing the quantities bill valuation has hundreds of years of history, with continual development, has been relatively more mature. This article through studies abroad the quantities bill valuation based on the theory of, sum up the foreign the quantities bill valuation based on the characteristics of the valuation analyses existing problems of how to solve the current problems existing the quantities bill valuation put forward some methods to resolve problems; At the same time for our country to the list of quantities valuation, proposes an influence through analysis to calculate the influence factors influence coefficients, to determine the importance of influencing factors, so as to determine the effect factors of the unit price for the future when analysis, improve the accuracy of the bid price quotation. Finally by the example analysis on the above research conclusion applied in the process of case study, we find out the cost of the project affect the main influence factors, and calculated the factors that influence the effect of the size of the coefficient and its sort, find out the influence of some of the most important factors, for these factors is analyzed and determined the factors that influence future unit price; In case the process of analysis, it also summarizes the impact that the valuation some important parameters, such as the cost of the project element content, components, such as the comprehensive change rate, risk premium rate, these parameters on the significance of reference to offer similar projects.
Keywords/Search Tags:the quantities bill, The quantities bill valuation, Market, risk
PDF Full Text Request
Related items