Abstract/Summary:PDF Full Text Request
As committed to the electronics industry base in western of Gonghe town in heshan, thenext few years the region is bound to grow rapidly, power load is the region’s power supplyability is difficult to meet the rapid growth of electricity demand, be badly in need of addingnew substation.A110kV Hongjiang substation feasibility research work in the background.First of all, this article simply introduces the research background and significance, thedesign and research, explained the project summary and thesis chapters arrangement,secondly from power balance and electric power system load forecasting, power griddevelopment planning, this paper expounds the necessity of hong jiang substation project, andcarried on the detailed argumentation to system access schemes comparison, a clear powersystem, power system secondary configuration principle, combining with the argumentationsystem, in the reasonable area system planning, give full consideration to various aspects offactors, the substation site and the determination of line path, puts forward the project.Finally, in determining the substation configuration plan and route path, on theengineering investment estimation, analyzes the economic benefit of the project, andconcluded the research conclusions: the feasibility of the project technical scheme andeconomic benefit in the project feasible.
Keywords/Search Tags:A feasibility study, substation, Investment estimation, Project assumptions
PDF Full Text Request
Related items