Shenying Road (Youth Street To ShenDan Tie Road) Expansion Project Feasibility Study

Posted on:2013-06-15Degree:MasterType:Thesis
Country:ChinaCandidate:Y CaoFull Text:PDF
GTID:2232330371980435Subject:Project management
Abstract/Summary:PDF Full Text Request
Shenyang muddy south new city of shenyang is the important development area,according to the municipal government of unified planning, will be built into the futureof administrative center of shenyang, science and technology center, the cultural centerof emerging area.At present new city road network by the eastern shen muddy south this avenue,west ShenYing highway, south road, the northern shenyang taoxian round high-speedFuDao composition, the four road surrounded by a ring of the formation of the newmuddy south, realize the new town, and the city more convenient connection. Theconstruction of the new requirements must advance traffic, so ShenYing of reform ofthe highway is imperative. At present the shen avenue, and shenyang taoxian way roundhigh-speed FuDao are primary highway and has built open to traffic, and as a new citytraffic of the main ShenYing muddy south road is narrower, can’t satisfy the growingtraffic demand and the life need along, so ShenYing highway reconstruction to perfectmuddy south new city road network structure, promote the regional economiccooperation, pull shenyang economic development to have the important meaning.Paper is divided into ten chapters, to ShenYing highway (youth street to shenDanTie sections) expansion project of the feasibility of the system, this paper mainlyincludes the following section:The first chapter: almost AssyriaProject construction reason, combined with the network and the programming ofthe new muddy south of traffic OD survey, this paper discusses the necessity of theproject construction, especially the regional2013will take "twelve luck" held therailway passenger special line and adapt to the construction of the new south station.Puts forward the specific standard of construction project and construction scale,determine the construction principle and main points of the route, and calculate the investment.Chapter2: present situation, development and construction necessityThrough the introduction of the current state of the economy and society ofdevelopment, combined with the actual situation of the project construction area anddevelopment forecast, improve the overall service level of main line, this paperdiscusses the necessity of the project construction.Chapter3: traffic analysis and predictionThrough the method of traffic flow forecast growth rate, the elastic coefficientmethod to determine growth rate.The fourth chapter construction scale and technical standards Chapter5construction conditions and preliminary scheme Discusses the project area of landform,engineering geology, earthquake, engineering geological evaluation, hydrological andmeteorological, combined with the road materials and transport condition, puts forwardthe preliminary design of the project plan. And the project’s impact on the environmenton the evaluation, and put forward the slow project the environmental impact ofcountermeasures.Chapter6investment estimation and financingChapter7of the economic evaluationChapter8energy saving evaluationChapter9implementation planAnalysis the project area of the implementation of the restriction condition and theproject period, the quality and the cost of the important factors, work out thecorresponding implementation plan.The first chapter ten questions and SuggestionsWith project construction of the specific situation, proposed the project implementationprocess problems that may occur and the processing method, and the implementation ofthe project put forward reasonable Suggestions.
Keywords/Search Tags:Feasibility study, an expansion project, investment estimation, traffic flow forecast, implementation plan
PDF Full Text Request
Related items