Font Size: a A A

Analysis On The Investment Benefit Of Daan Heat Source Plan Building Project

Posted on:2014-08-09Degree:MasterType:Thesis
Country:ChinaCandidate:W Y ChenFull Text:PDF
GTID:2252330425965481Subject:Business Administration
Abstract/Summary:PDF Full Text Request
District Heating Project Based on the JK heating source factory Da’an City IndustrialAnalysis of project investment benefit as the object, the project to meet the Da’an Cityindustrial concentration area and Yucai Road North District heating as the goal. After theimplementation of the project in Da An City industrial concentration area and the road to1130000M2heating area of north area of existing heating can achieve all of centralheating, heating load for planning and development with adequate margin. After thecompletion of the project, regional heating area can all realize centralized heating. Thispaper focuses on the district Da’an City Industrial (North) of central heat supply and pipenetwork transformation, project investment, the fundamental purpose is to maximize theprotection of government investment project of heating in winter and the daily productionneed, the industrial concentration area to restructure existing resources, rational planning,broaden sources of income and reduce expenditure, not only make the area to improve theenvironment and policy security, improve the JK heat supply rate of return on investment,reduce the various risks in the process of construction investment of the project, so as toachieve industrial zone industrial clusters, the demonstration effect. The premise of thisanalysis in the important argument clear management technology economics andscientific evaluation, a comprehensive analysis of JK heat supply in the areas ofgovernment policy standard and preferential conditions, construction budget cost control,the laying of pipe network and transform the network technical support, the surroundingenvironment and other factors, with the knowledge architecture, economics, humanresources management, accounting, statistics, etc., to build scientific and reasonableevaluation analysis system, and the JK heat source plant investment benefit analysis, forthe final project is feasible and can make a correct conclusion as soon as possibleconstruction.Based on the centralized area Da’an City Industrial (North) of central heat supply and pipenetwork transformation, project investment, and further to the JK heat supply in YucaiRoad North site construction, regional resources investigation, environment andconstruction of residents, local enterprises to visit, to understand the actual situation. Atthe same time, the engineering construction market investigation, inquiry, engineeringmachinery and transport radius and the construction scheme of the project review,prerequisite to scientific purpose and function.By calculating the project breakeven point is68.73%(production value), explained thatthe enterprise production only reached the design capacity of68.73%, can achieve thebalance of profit and loss. Thus it can be seen that the project has certain anti risk ability.Technical reserve projects is sufficient, team stability, reasonable structure, strongtechnical force, has the rich construction experience, the construction scale of the projectand the volume of funds invested in moderation, sources of funding have safeguard, havegood economic conditions. The technical route and technical measures of constructionprojects, supporting mature, the first construction and investment analysis of science, theinvestment is feasible.
Keywords/Search Tags:Industrial Concentration Zone Heating, Investment Benefit Analysis, Financial Analysis, Breakeven Analysis, Sensitivity Analysis
PDF Full Text Request
Related items