Font Size: a A A

Study On Project Construction Quality Control Of JH Pipeline Construction

Posted on:2014-11-27Degree:MasterType:Thesis
Country:ChinaCandidate:Q Y LiFull Text:PDF
GTID:2252330425965570Subject:Project management
Abstract/Summary:PDF Full Text Request
As China’s economy continues to develop, water conservancy industry has beenthe rapid development of the water sector is a national basic industries related topeople’s livelihood, has played an increasingly important role in the nationaleconomy. Regardless of how the development of water conservancy industry qualityrequirements of the project from start to finish was first place. The quality of waterconservancy projects directly related to state property and people’s lives and safety,water conservancy projects related to long-term development of enterprises related tothe applicability of hydraulic engineering, economic and social nature.With the constant improvement of hydraulic engineering market, the market isgradually toward a sound system, however, construction quality control managementsystem but did not get along with a corresponding improvement. Many still existbetween engineering projects and corporate responsibility is unknown, strictconstraints and other issues, seriously affecting the proper implementation of theproject construction supervision, in addition, a fair degree of competition in themarket is not enough; serious issues such as protection areas also seriously hamperedChina’s construction development of the industry.Quality is the credibility of the enterprise, is the life, works and ensure the qualityof this paper is the fundamental purpose. JH quality of construction projects in orderto effectively control and management to ensure the quality of the project, theconstruction of this project in strict compliance with the tender document qualitymanagement requirements, the full implementation of ISO9001:2000qualitymanagement system, strict implementation of full, round, full quality control processto ensure project quality and efficient completion.In this paper, the quality, the concept of project quality and quality managementsystems were elaborated. Through the development of quality management theoryresearch at home and abroad, combined with JH pipeline project quality management,quality control problems for our quality management and control of water projectscarried out in-depth research. The main contents are as follows:Firstly, the quality of construction works carried out multi-faceted study,elaborated the characteristics of the pipeline project quality and quality problems,each forming stage pipeline construction quality, analyzes the main factors affectingthe quality of water conservancy projects.Secondly, the study of China’s water conservancy project quality managementsystem and pipeline management system, describes the process of qualitymanagement, quality control is clearly an important part of quality management is animportant part of the quality assurance engineering. Describes the water conservancyproject pipeline quality management approach-total quality management, waterconservancy further proposed pipeline project quality control methods.Finally, the use of JH project instance, the theory with practice, discusses thebasic method of construction process quality control, aimed at improving the qualityof water conservancy construction enterprise management level, optimizing qualitymanagement, improve the quality of water conservancy projects.
Keywords/Search Tags:JH pipeline, project quality objectives, Quality Management, QualityControl
PDF Full Text Request
Related items