PSPC Ships’ Optimization And Improvement Of Slipway Construction And Cycle Management

Posted on:2015-03-21Degree:MasterType:Thesis
Country:ChinaCandidate:L WenFull Text:PDF
GTID:2252330428481766Subject:Naval Architecture and Marine Engineering
Abstract/Summary:PDF Full Text Request
PSPC is an important part of modern ship construction; it is a very important investigative project to engineering management about carry out details and reasonable cycle time of PSPC ship construction, especially after the full carry out of PSPC construction standard. Currently, each ship yard have made itself management model in the control ship construction cycle time. But the detail of the work is to need further enhance. This paper describes about the carry out contents and choice reasonable cycle time of PSPC ship construction. In order to provide data reference for future achieves a reasonable construction cycle time of the PSPC ship. The specific content of the paper is as follows:This article describes the background and impact on domestic shipyards of PSPC ship. It explains the process the actual construction of the ship and the necessity of this project study, the PSPC standard carry out, it’s important to the entire ship development. Therefore, the study is very important guiding significance to construction technology and a reasonable management cycle time use.This paper use a type ship as an example, it describes the actual construction process and cycle time plan. Through many years conclusion experience to complete crafts technology problems. Apply to latest work out plan of the grids. Choose reasonable cycle time to do product. To adjust build up sequence of the blocks and to optimist the lifting sequence of global blocks. Make full use of three-dimensional method to track and locate. Final introduce to quantify works have a positive effect to product.According to actual situation confirm this mode and method is feasible. But Due to different circumstances of each shipyard’s actual production, this work is only for reference to next researchers.
Keywords/Search Tags:PSPC, Construction Cycle Time, Grid Plan
PDF Full Text Request
Related items