Font Size: a A A

Study On Application Of Total Productive Maintenance In Hot Strip Mill Of Tisco

Posted on:2013-07-04Degree:MasterType:Thesis
Country:ChinaCandidate:X F BaiFull Text:PDF
GTID:2269330392970745Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Construction to become the world’s most competitive hot rolling process of hotstrip mill of TISCO is the strategic goal of development. With the development ofsteel industry, technological transformation of production equipment, TISCO hot stripmill plant equipment advantage has gradually disappeared. Through the fullimplementation of TPM management, improve the overall efficiency of equipment,improve the overall quality, continuous upgrading of product quality is adapted to therequirement of goal of strategy of the only way.The core of TPM management concept, the establishment of enterprise totalproductive maintenance management system, full implementation of the system, theequipment, the entire process of management," the concept of zero "(i.e.: accidentsto zero, zero defect quality, downtime is zero, zero waste)as the goal, give full play tothe comprehensive efficiency of equipment, establishment of enterprises for thespecial equipment of modern management system, at the same time, these are also thesubject of study the main significance and fundamental starting point.This paper focuses on the definition of TPM, development process are researchiedin detail, and its promotion and significance are researchied in this paper. In this paper,combined with the hot strip mill plant actual production status and characteristics, inthe process how to implement TPM in application of the model in detail, on the use ofthe results obtained and difficulties encountered are researchied in detail, the influenceon the popularization and application of the main factors were analyzed in detail. Onhow to improve the comprehensive efficiency of equipment, are analyzed in detail,and discusses its operation rate and time, performance operation rate, the good productrate of the relationship between.
Keywords/Search Tags:TPM, Comprehensive efficiency, Operation rate and time, Performance operation rate, The good product rate
PDF Full Text Request
Related items