As China’s overall economic strength of the rapid increase, the government pay more attention to basic industries, public infrastructure investment and construction, the construction of such projects need to invest a lot of money, is bound to bring enormous financial pressure. In addition, China’s infrastructure construction projects and demand is greater than the existing capacity-building, facing oversupply situation, how within the stipulated time of completion of quality and quantity, protection of huge capital investment return guarantees, is worth studying. Given the above project financing and how to effectively promote the construction projects these two issues, discuss the current construction of the more commonly used mode of BOT model and EPC to seek the integration of these two models to solve the current infrastructure problems.This paper describes the construction of BOT Financing Mode and EPC contracting model of the basic theory. On the BOT model, the concept of analysis from the BOT model of participants and their responsibilities, and from the BOT model describes four stages of the model form, the last of analyzing the characteristics of the BOT model. On EPC mode, the first analyzes the evolution of project management, the introduction of the concept of EPC model were elaborated design, procurement, construction three aspects of meaning; Second, from the various stages of EPC project specific work content, summed up in EPC Mode. Finally, from the integration of efforts, time integration, participation of people converged three angles constructed BOT+EPC project investment and construction of the new model.Secondly, the introduction of project risk and risk management of the main characteristics of the content, focusing on the BOT project risk and project risk EPC, BOT projects were constructed Risk Index System and EPC project risk index system; then combine these two risk index system, Summary build BOT+EPC mode risk index system. Secondly, the introduction of risk management related content:risk identification, risk assessment, risk response, obtained BOT+EPC mode, the overall project risk checklist highlights the Analytic Hierarchy Process (AHP). Finally, the combination of the above studies, Chongqing South Road BOT+EPC project done some research, the project risk response comments.
Keywords/Search Tags:BOT+EPC mode, risk identification, risk assessment, risk index system, AHP
PDF Full Text Request
Related items