Font Size: a A A

Study On The Construction Of General Contractor’s Fine Management In EPC Mode

Posted on:2014-05-23Degree:MasterType:Thesis
Country:ChinaCandidate:B LeiFull Text:PDF
GTID:2269330401487272Subject:Management Science and Engineering
Abstract/Summary:
With the EPC contracting market competition intensified and EPC contracting theirown development, the original extensive management mode of the EPC generalcontracting companies have been unable to adapt; EPC general contracting businessestablishes the internal refinement management system, to be effective to manage toachieve a fundamental change in management mode, and has become an essential wayto solve their own management problems, stand with the international advanced EPCcontracting management step by step, steadily improve and maintain theircompetitiveness. On the one hand, the meticulous management system of the generalcontractor under the EPC model can greatly enhance the EPC contracting enterprises’management and competitiveness. On the other hand, it can broaden the applicationscope of the refinement management theory.On the basis of elaborating the relevant theory and actual survey, the authoranalysis the management problems and their causes when EPC general contractorscarried out business under EPC mode; at the starting point of the problem in themanagement under the The EPC general contracting model,and guided by the idea ofmeticulous management,useing the system theory to construct the framework of EPCprojects’ meticulous management;useing the theory of modern project management toconsider the way to of constructing the framework of projects’ meticulous managementbased on EPC general contracting model;Finally, taking procurement stage under theEPC mode as an example,take the method of constructing the framework of EPCprojects’ meticulous management for special application,and construct the sub systemof procure meticulous management based on EPC general contracting model,and makerevisions of the way to construct the framework of EPC projects’ meticulousmanagement during the processing of constructing the the sub system of EPC procuremeticulous management。...
Keywords/Search Tags:EPC general contracting model, Meticulous management system, Structure of Hall, Integrated management, Procurement management
Related items