Research On Improvement Of Logistics Management In Sinopec Hunan Pipeline Construction Project

Posted on:2014-11-14Degree:MasterType:Thesis
Country:ChinaCandidate:W T LiFull Text:PDF
GTID:2269330425460845Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the rapid development of China’s oil pipeline construction, logisticsmanagement has become an important part of the project construction management. Inthe fierce market competition, enterprises not only need to reduce production costs,expand market share, but also need to optimize logistics management, as enterprisesthird profit source of economic. Means of support necessary to carry out the constructionof the pipeline project logistics activities, logistics activities through procurement,transportation, warehousing, information management, and effectively protect thesmooth construction of the pipeline project. Implementation of the pipeline projectlogistics management, helps to improve project logistics system optimization, and a playa logistics management professional services in the pipeline in the supply chain effect.This paper by the status of Sinopec Hunan pipeline construction projects inlogistics management of the conducted analysis, pointed out that the presence of SinopecHunan pipeline construction projects in logistics management and its reason; On thisbasis, Sinopec Hunan pipeline construction projects in logistics management proposedthe improvement program, emphasis from procurement, transportation, warehousing,information management, logistics management for the problems and improve research,and improving the feasibility analysis; Finally, pipeline construction projects in logisticsmanagement improvement program implemented security analysis of the projectlogistics management improve the conditions of implementation of the program, projectlogistics management improvement program implementation obstacles to theimplementation of the expected results and project logistics management improvementprogram and remedies.This article by Sinopec, Hunan pipeline construction project logistics managementimprovement study, to practice in the future to ensure that the duration and quality of thepremise, according to optimize the logistics system model to the organization orderingand transportation and scheduling program, to improve the level of integratedmanagement improve the efficiency of the pipeline construction project management,construction projects for the state as much as possible to save social resources.
Keywords/Search Tags:Sinopec Hunan branch, Logistics management, Improvement, Pipelineconstruction
PDF Full Text Request
Related items