| In this article, through an introduction to the background of helicopter industrydevelopment, combining with the project management problems of tianjin helicoptercompany101building, the research subject is put forward by the helicopter101factory building project construction targert management. The main research contentis how to formulate target management methods and measures in line with thecharacteristics of the characteristics of helicopter101workshop project.The concept of project objectives management and project management researchstatus at home and abroad were summarized.The paper described the present situationof101workshop project and its goals and design factors, summed up the101workshop project objectives, and ultimately determined the project101each targetspecific content.Based on general project target management method and its application inthe analysis of the shortcomings, combining with the characteristics of101plant engineering, four major management by objectives innovative solutions andmeasures are put forward about101helicopter factory cost, schedule, quality,HSE management, including the operation standard classification in advance solve101workshop complex operational cost classification and evaluation, usingthe method of quality standard weights to solve overlapping influence of101plant multiple standard quality target evaluation, scheduling domain decomposition method is used to solve the problem of factory building101multiple projectprogress management by objectives, qualitative risk analysis method is used tosolve the problem of uncertainty management issues in helicopter plant HSE system.At the same time a detailed effective goal management measures are formulated including the different system designed for cost managementmeasures, quality control measures by explaining drawing on project, HSE emergency management measures by coordinating schedule information platform, etc.Advantages and disadvantages of target management methods and measuresused in tianjin helicopter101workshop project are Summarized on the basis o f discussion above, the main conclusion,research shortcomings and further problems in future research are put forward. |