Research Of Construction Claim Management Of Employer Based On Code Of Bills Of Quantities And Valuation For Construction Works Of2013Version

Posted on:2015-10-20Degree:MasterType:Thesis
Country:ChinaCandidate:W W LiFull Text:PDF
GTID:2272330431950547Subject:Project management
Abstract/Summary:PDF Full Text Request
The construction industry is rapidly developing in our country, with the increase ofconstruction difficulty and the construction technology of increasingly complex, engineeringscale, such as widening engineering of unpredictable factors increasing, project claim isbecoming more frequent, more complicated.2013version of the code of bills of quantities andvaluation for construction are introduced, and face new requirements, engineering costmanagement of engineering claim management is also facing the new situation.In claimmanagement, contractor than client more professional, experienced contractor is good atthrough the low price strategy to win the bid, reuse engineering claim high profits, in the faceof experienced, professional and technical strong contractor,2013version of code of bills ofquantities and valuation for construction standard and the new environment, the developer ofthe project claim management task at present.Based on the above background, this paper studies the2013version of the bill ofquantities valuation project claim management under the specification of the developer.Firstof all, by means of summarizing and consulting literature materials, comparative study hassummarized the domestic and foreign research present situation of engineering claim,analyzed the2013version of the bill of quantities valuation standard for engineering c ostmanagement reform.By discussing the developer claims management content, procedures,policies, insufficient, analysis the2013version of the bill of quantities valuation standardstipulation about the claim, will the developer claims management studies focus on theprevention of the contractor claims and deal with the contractor to make two aspects.In claimsprevention study, a2013version of the code of bills of quantities and valuation forconstruction and2013on the basis of construction contract demonstration text comprehensivescreening contractor claim chance and unbalanced quotation, detailed to formulate thepreventive strategies, based on the thought of the whole process of management, summarizesthe client claim for the whole process of prevention strategies.From the claim negotiationgame two aspects to study the preparation and negotiation of the developer claims processing,through qualitative research expounds the claim negotiation preparation, using the gametheory and bayesian theory claims processing negotiation model, used for quantitativeanalysis was carried out on the claim negotiations bid.Using the methods of engineeringanalysis, it shows that under the2013version of the specification of the valuation, this paperputs forward the whole process of claims prevention strategies can effectively prevent the happening of the claim, the claim processing model can be achieved good effect in the claimnegotiation practice.
Keywords/Search Tags:Code of bills of quantities and valuation for construction works, Employer, Construction claim
PDF Full Text Request
Related items