Font Size: a A A

The Study Of The Application Of Bill Of Quantities Valuation

Posted on:2007-03-31Degree:MasterType:Thesis
Country:ChinaCandidate:W LuoFull Text:PDF
GTID:2132360182495589Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
The carry out of bill of quantities is an important act in deepening reform with construction cost management, it is also an important act in conforming the order of market to new condition. Calculating prices by bills of quantities can really meet the needs of construction cost management reform of "Government Macroadjusting Prices, Enterprise Quoting Prices and Marketing Forming Prices" .Form the issue of "specification of calculation by bills of quantities in construction project" put into effect on l#July 2003, all the construction parties has got a clear conception of how to use BOQ. However, contrasting the traditional ways of calculation prices with bill of quantities, the later one is a new thing for us. There are still a lot of problems in application of BOQ calculating prices. To ensure the spreading of BOQ valuation, related department must cooperate closerOn the bases of studying "specification" , the paper summarizes the merit of BOQ and analyses the universality problems in application of BOQ, under the mode of BOQ how to bid and quote price, how to build the matching condition,.The paper introduces the condition of appraising bids in the construction field, and then set up the multiple objective decision-making model of the construction tender evaluation. It explains superiority and feasibility of the method by analyzing engineering example. That's an available method of the owner tochoosing the best bidder which will produce the greatest benefit for bid inviter.
Keywords/Search Tags:bill of quantities valuation, the market of construction, construction enterprise, multiple objective decision-making model
PDF Full Text Request
Related items