Project-based Version Of The Bill Of Quantities Of Engineering Claims

Posted on:2017-10-14Degree:MasterType:Thesis
Country:ChinaCandidate:W ZhangFull Text:PDF
GTID:2322330518966627Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Through decades of development,Chinese construction industry has been booming from the original rough style gradually transformed into reasonable standardization progress.But in recent years,more and more construction enterprises are set up in our country,the construction project is increasingly diminishing.Because of this,the whole construction market becomes more and more competitive.How to survive in the fierce competition and occupy a place become a common theme of each construction enterprise.So,more construction enterprises choose "low bid,high compensation" as the profit strategy.First,they win the bid at the low or slightly higher than the cost price.And then they snatch at every chance of claim to improve the profitability of enterprises in engineering construction.Therefore,how to better manage the claims are becoming emphases for research not only in contractors but also employers.This paper discusses the above question by qualitative and quantitative method becasue this method has complementary advantage:According to Description of cliam in Code of Valuation with Bill Quantity of Construction Works(GB 50500-2013),This paper does particular analysis for the cause of claim affair under the mode of bill of quantities.The author puts forward the construction project quantity list valuation management strategy under the mode of claim the.Take a construction project in Sichuan as an example,this paper introduced in the implementation of the project,and discusses the valuation procedures for the implementation of the claim management work mode and the program in the 2013 edition of bill of quantities in the implementation process,both sides claim should pay attention to the problem,and explains the calculation method of the duration and cost of claims the list of the calculation process in detail,can provide a reference for the similar project claim management.Through the analysis and research,the contracting parties can recognize the mode of list of claims the reason,the coping strategies,understand the processing procedures of claims and claims,normative behavior.Furthermore,it is beneficial to improve the level of contract management,ensure the effective implementation of the contract,the employer to strengthen the cost management level and enhance the profitability of the contractor,regulate the construction of the main parties,to ensure the healthy operation of China's construction market.
Keywords/Search Tags:Construction engineering, Valuation mode of bill of quantities, Construction claim, Management strategy
PDF Full Text Request
Related items