Font Size: a A A

Concvete Filled Steel Tube Arch-bridge Construction Monitoring And Control Technique Research

Posted on:2015-03-12Degree:MasterType:Thesis
Country:ChinaCandidate:B C ZhangFull Text:PDF
GTID:2272330452458577Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Bridge monitor project in our country is a construction service developing and makingcountribution these years.Its convenent is measuring height,alignment,stress-strain ofconstraction process attach to target bridge.Bridge monitor project s purpose is monitoringall kinds of function of bridge in constraction process,sharing responsibility of the owner andthe construction side.In a word,bridge monitor is an important part of bridgeconstruction.This assage make background of ziyang ximenhe bridge monitorproject,introducing bridge environment hydrology condition,researching detail inconstruction s software building,mesearing,data recording,and analisysing.Exploringreasonabe arch bridge monitor method,excellent effect comes.Software building analisysingand controling is a good method of arch-bridge monitoring and it is active for the purpose ofeliminating parameter error attach to effecting bridge construcition aim and making surebridge s structure stress and linear satisfy design demand.This could be made as an importantcase to apply,also be made as a modle for other bridge.
Keywords/Search Tags:bridge monitor, monitor project, ximenhe bridge, software building, dataanalisys, conclusion
PDF Full Text Request
Related items