| In this paper, J company orbit communications turnkey project background,subcontractors orbit communications research project of the evaluations, the purpose is toselect subcontractors evaluation to quantify. From the project before bidding generalcontractor for the subcontractor selection began, the project won the bid to operate until afteremergence for the previous project cost overruns, schedule delays, substandard equipmentquality, service is not in place and other issues. Use project management system in the overallmanagement, quality management, schedule management, procurement management,communication management, etc., analyze subcontractor selection of indicators proposedqualifications, performance, quotes, technical ability, financial ability to pay, prestige, quality,safety related evaluation of production capacity, service and research. Well establisheddivision of rights and obligations between the general contractor and subcontractors, theactual work produced and co-ordination to solve the problem, so as to ensure the quality ofthe project and project schedule control equipment. Let established between partnerships andsubcontractors mutual benefit, a virtuous circle, win-win cooperation between the generalcontractor and subcontractors.Based on the course of the study, by convening a meeting of experts to determine theorbit communications project with brainstorming and fishbone diagram methodsubcontracting primary and secondary indicators supplier evaluation index system, ThroughANP and using Super Decision software to determine the index weight.Metro Line1through D orbit communications project examples to evaluate the use ofindicators, to elect the best subcontractors. Transmission system on which the threecompanies to choose,Although can be seen from the score of A company in enterprisequalification, product quality, internal management, slightly better than the other two,Butprice is higher, total score ranked second;C company in terms of price of the product is low,but the other three aspects of the score is not high, total score ranked third;Comparison Bcompany offer recognized, and several other aspects also enterprises, and A total score rankedfirst.So the contractor B company as the transmission system of the subcontractor.Results of this study can provide guidance and practical methods subcontractors orbit communications turnkey enterprise project selection, select subcontractors for enterprises toachieve standardization, improve work efficiency. |