Transmission Line Project Security Risk Identify Cation And Management

Posted on:2016-11-27Degree:MasterType:Thesis
Country:ChinaCandidate:D LiuFull Text:PDF
GTID:2272330461465021Subject:(professional degree in business administration)
Abstract/Summary:PDF Full Text Request
Transmission line project, is China’s power grid construction projects ininfrastructure projects, for the completion of China’s UHV conduct intelligent powergrid and alternative energy projects to achieve significance. Safety transmission lineproject directly affects the implementation of power projects, as China’s powertransmission lines has been increasing awareness of security risks, our research ontransmission line project risk identification and management to get more attention.But because of the internationalization process of the implementation of the projectmanagement standards exist to control differentiation, our transmission line projectfor the identification and management of standardized security risks still to beimproved, further exploration and specification of security risk transmission lineproject has important practical significance.Based on this, the relevant basic research by combing, and transmission lineproject risk identification and management processes in detail, and the method of casestudies, risk identification and management of Tongxiang transmission line projectswere evaluated, LEC method to calculate risk while taking advantage of the value,risk quantification and better evaluate the risk level and provide the appropriate basisfor decision making.In this paper, transmission line project safety risk identification and managementof detail, risk identification and management processes, including transmission lineproject risk identification, risk assessment, risk assessment and risk management, suchstandardized processes for project safety risk identification provided good reference,the method is scientific and reasonable; there are many, including brainstorming,Delphi method, checklists security risk identification method, etc. The method ofpower transmission lines, and summarize the actual risk may be involved in the lightof experience, conduct check every one of them, for the identification of risk issignificant; the core of risk identification and management of risk in the evaluation,LEC method provides a relatively simple way of operation, and by correspondingreference value, combined with the actual situation of enterprises, can Through rapidevaluation of in-house experts, and soon come to value at risk, and the risk level ofthe division, for enterprises to develop appropriate risk response mechanism providesa good reference; paper Tongxiang transmission line project as a case study in the useof this risk identification and management model summary, the basic profile ofTongxiang transmission line project are summarized, and the project risks exist in theuse of this method of research conducted to identify and evaluate emerging riskspresented targeted solutions programs and specific measures in terms of other projectsalso have some reference guide.
Keywords/Search Tags:Risk Identification, Risk Assessment, Risk Management, LEC, Transmission Line Project
PDF Full Text Request
Related items