Research On The Risk Management In The Plant Construction Project Of Tianjin Second Manufacturer Welcome Meat Co

Posted on:2015-10-18Degree:MasterType:Thesis
Country:ChinaCandidate:H Y XuFull Text:PDF
GTID:2322330485996147Subject:Project management
Abstract/Summary:PDF Full Text Request
As the state continues to strengthen macro-control, is mainly engaged in residential development in the past developers turning to other areas. The moment, due to the expansion of corporate demand for industrial real estate is growing rapidly, industrial plant rental business has a great upside, so there are a lot of real estate developers will be more inclined to industrial real estate development as its new targets. Tianjin Second Manufacturer Welcome Meat Co. meat processing and logistics base project a project, a total of 15 s ingle building, the paper two providers welcome plant construction project risk management process has been studied for likely emerging risk factors to identify, analyze, avoid, reasonable risk management measures to ensure the smooth implementation of the project.This paper is divided into four parts. The first part is the theoretical analysis, the first definition of risk to the connotation plant construction project risk management, and based on the perspective of the owner of this paper, a detailed ana lysis of the relationship between the characteristics of the plant construction project owner and its relationship with other stakeholders. Then, focuses on the development process and reviewed research project risk management theory in this field in our country, the last of the risk assessment methods are outlined briefly the AHP, subjective scoring method, sensitivity analysis, Monte Carlo Romanian law, etc., for the later risk assessment methods to choose a foundation in risk assessment practices. The second part of project risks identified. Article by two manufacturers welcome plant construction project analysis and overview, drawn to the risk factors that the owner has five categories: risks related to the main economic risks, natural risk, technology risk and management risk. Then there is subdivided down 15 specific risk indicators, forming a relatively complete system of risk indicators, only two suppliers to help welcome Meat Food Co., Ltd. in the subsequent risk management has control objectives, but also for related similar construction project owners to provide a good reference. The third part of this paper, several more commonly used risk assessment methods are compared, the specific practice of combining two providers welcome plant construction project, select a combination of qualitative and quantitative analytic hierarchy process for risk analysis of the project calculations. Based on the weight of each index term weight calculations, two manufacturers welcome plant construction project owners are facing a higher risk management in the organization and coordination of risk, the main risk associated risks and contractors and contractor supervision units units Total seek to bring risk and economic risk of poor liquidity risk and other four aspects of risk threats. The fourth part of risk control measures put forward suggestions.From the perspective of two suppliers to develop owners welcome plant construction project, the project risk assessment study analysis and control management. First, in theory, this article will apply reasonable and effective risk identification process of AHP can provide ideas and methods can learn from other risk management research, to some extent, development and enriched the construction risk management theory and technology, has some theoretical significance. Second, in practice, the paper through two providers welcome risk Tianjin plant construction project owners faced only able to analyze, in accordance with the risk management process, to conduct a comprehensive risk management mainly deal with three aspects of risk identification, risk assessment and risk research project to help the owners to effectively avoid risks, eliminate or reduce potential losses and ensure the smooth implementation of the project, has important practical significance..
Keywords/Search Tags:Risk Management of Real Estate Project, Project Risk Management, Risk Identification, Risk Assessment
PDF Full Text Request
Related items