Font Size: a A A

The Study Of Engineering Project Management Mode Of Construction Of Jilin Oilfield In Changling Gas Field

Posted on:2015-03-02Degree:MasterType:Thesis
Country:ChinaCandidate:Y W ChuFull Text:PDF
GTID:2272330467451948Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Ten years ago the Jilin oil field began using the related theory knowledge ofproject management of project management, in the management process ofaccumulated successful experience rich, but the development of project managementin foreign to many years earlier than the Chinese, so the developed countries in thisand has well developed and advanced management methods and techniques, we is acatch-up phase.This study is mainly through the simple description of the Changling gas fieldproject management model of ground construction and development, and thenanalyzes the Changling gas field ground construction project management of existingresources advantages and opportunities, analysis of many problems of gas fieldsurface engineering construction project management mode in running in.In theproject management process we need theory and principles of scientific management,the project of Changling gas field ground construction has been sustained, stable,coordinated development in the process of construction management, we need to drawlessons from the international advanced management mode as the basis,The general theory and then follow the principles of project management, findsuitable for Jilin gas field ground construction project sustainable, stable, coordinateddevelopment direction, in order to fully draw on the international advancedmanagement mode of the project, the research suits the project of Changling gas fieldground construction of innovation management model. Through the study the authorhope can improve the gas field construction project management level, to acceleratethe construction speed of gas field, ensure the increase in gas production, makecontribution for the sustainable and stable development of Jilin oil field.Summarized the related theory of this research involved on the project in Jilinoilfield gas field ground construction, theoretical analysis of the knowledge used inthe process of project management, and summarized the Changling gas field groundconstruction project management system and mode. After the foundation of analysis and research, construct project of Jilin oil field ground construction managementmode, analyzes the feasibility and application value. This management model putforward effective measures to ensure its smooth implementation.
Keywords/Search Tags:gas fields, the ground construction projects, project management, management model
PDF Full Text Request
Related items